Following the snowstorm and snow clearance, all Cambridge Hubway stations will reopen as of 8:00 PM on Monday, February 13th.

The Hubway system was temporarily shut down at 3 PM on Sunday. Regular system operations will resume at 8 PM after Hubway field staff has cleared snow from all station docks and bikes. This means that Cambridge stations, which operate year-round, will again be available for use. Stations in Boston, Brookline, and Somerville are expected to reopen later in the season. For real-time station, bike, and dock availability, visit our station map. For questions about system availability, please call to speak with a Member Service Representative at 1-855-9HUBWAY (948-2929).